Aylesbury Vale Area

VALP Further Main Modifications

Ended on the 9th February 2021
If you are having trouble using the system, please try our help guide.

Chapter 7: Transport

(8) FMM089

MM reference

MM210

Page, Section/Para

238, T3 Supporting local transport schemes

Proposed further changes

Modify policy T3 to incorporate infrastructure that has been tested, is required, and is subject to known delivery mechanisms.


FMM090

MM reference

MM212

Page, Section/Para

244, T4 Capacity of the transport network to deliver development

Original text

Table 17: inserted Table 17 BCC guidelines for Transport Assessment thresholds.

Proposed further changes

Table 17: update table 17 in line with new Use Class Order 2020.

Add new footnoteWhere applications are made for 'open' class E uses the lowest threshold for uses in that class will be utilised.

Reason for change

Change to use classes order


(1) FMM091

MM reference

MM218

Page, Section/Para

249, T8

Original text

*in private dwellings including flatted development the minimum of a 3.7 KW 16A or higher Type 2 electric vehicle dedicated charger will be installed...

  1.  For high turnover parking, such as at a supermarket, leisure facility or hospital, 'rapid' electrical vehicle charging points will be installed (at least 43kW etc.) This is due to short time spent at such locations. (at least 43Kw/63A with a normal charge time of 30-60 minutes for an 80% charge).

Proposed further changes

*in private dwellings including flatted development the minimum of a 3.7KW 7.4kW 16A 32A or higher Type 2 electric vehicle dedicated charger will be installed...

  1.  For high turnover parking, such as at a supermarket, leisure facility or hospital, 'rapid' electrical vehicle charging points will be installed (at least 43kW / 63A with a normal charge time of 30-60 minutes for an 80% charge etc.) This is due to short time spent at such locations. (at least 43Kw/63A with a normal charge time of 30-60 minutes for an 80% charge). In addition, fast charge electric vehicle charging points (at least 7.4 kW 32A) should be provided in these locations.

Reason for change

Proposed change in response to representation(s