Aylesbury Vale Area

Object

VALP Main Modifications

Representation ID: 3463

Received: 17/12/2019

Respondent: IPE Orchestra

Agent: Arrow Planning Ltd

Legally compliant? Yes

Sound? No

Representation Summary:

The requirement for an early review should not be deleted and should instead be reinstated. The Housing Numbers for AVDC are set to rise under the Standard
Methodology, and the time elapsed since the HEDNA was prepared. Therefore, an early review should still be proposed to address the increased housing need. This would be the most appropriate strategy, as required by the NPPF.

Change suggested by respondent:

Reinstatement of the commitment to an early review;

Full text:

See attached document which is submitted on behalf of IPE Orchestra Land